Diverging clear, Breyer.         
Breyer is the control point to enter the AGS and begin double track south into Meridian. THe right hand track is the NB main which the diverging approach signal protects. the Southbound main is center, SB trains come down this track and there is a signal to allow restrictive movement if a NB move is needed on that track (dwarf). The far left is for both NS and Dunn roadbuilders to switch rock cars. Dunn roadbuilders can ONLY switch cars just up the switch point derail out of picture. NS will back rock cars down into the spur.
Date: 11/12/2017 Location: Marion, MS   Map Show Marion on a rail map Views: 105 Collection Of:   Michael Appleby
Author:  Michael Appleby
Diverging clear, Breyer.
Picture Categories: Yard,Signal,Track This picture is part of album:  Meridian and Surrounding, November 2017
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4841990